Files
dealplustech-astroreal/docs/HANDOFF.md
2026-08-30 11:07:25 +07:00

2.6 KiB
Raw Blame History

title, updated
title updated
Deal Plus Tech Engineering Handoff 2026-08-30

Engineering Handoff

Current State

  • Repository: /Users/kunthawat/Gitea/dealplustech-astroreal
  • Branch: main
  • Code commit: c0d8cacfbeb328424138b26e22cb31e82db453b6 (pushed and verified at origin/main before this handoff update)
  • HEAD: current branch tip of main; verify with git rev-parse HEAD after the handoff update
  • Remote target: origin/main
  • Working tree: clean after the verified code commit; this handoff metadata update is the only pending change

Completed

  • CcooL product page: /ฉนวนหุ้มท่อ-ccool/
  • CcooL images and pricing PDF added under public/
  • Navigation, product listing, breadcrumb, metadata, FAQ, Product JSON-LD, and CTA tracking updated
  • Robots/sitemap references and stale internal links corrected
  • Duplicate legal-page H1 output removed
  • Unsupported market-superlative claim wording replaced
  • Duplicate CcooL anchor ID removed; new-tab PDF link hardened with rel="noopener"

Verification

  • npm run buildpass, 44 pages
  • npx tsc --noEmitpass
  • git diff --cached --checkpass
  • Independent reviewer → pass, no security concerns or logic errors
  • Static output → 44 HTML pages, JSON-LD parses, Umami attributes are well-formed, images have alt; baseline-only duplicate SVG ID and blank-target links remain
  • Assets → five 1024×768 images; five-page A4 PDF; no PDF JavaScript/encryption

Known Limitations / Blockers

  • npm test cannot run because the project has no test script.
  • astro check reports 55 pre-existing errors in both baseline and final trees; no regression was introduced.
  • Production soft-404 behavior, Cloudflare crawler rules, live Search Console, and live external HTTP status were not changed or verified in this local push gate.
  • Domain-dependent SEO/deploy work is blocked until the real production domain is explicitly confirmed. Never guess it from repository configuration.
  • CcooL claims still need accessible first-party evidence; image CLS and complete ProductGroup/AggregateOffer modeling remain deferred.

Resume Procedure

  1. Verify the final git rev-parse HEAD and git ls-remote origin refs/heads/main after this handoff-doc commit.
  2. Before deployment or further SEO changes, confirm the production domain explicitly.
  3. Fix server-level 404 routing and verify an unknown URL returns HTTP 404.
  4. Recheck Cloudflare robots/AI crawler settings and publish claim evidence.

Evidence Index