docs: finalize engineering handoff

This commit is contained in:
Kunthawat Greethong
2026-08-30 11:07:25 +07:00
parent c0d8cacfbe
commit 3242939125
4 changed files with 14 additions and 9 deletions

View File

@@ -8,9 +8,10 @@ updated: 2026-08-30
- Repository: `/Users/kunthawat/Gitea/dealplustech-astroreal`
- Branch: `main`
- HEAD: pending verified commit at the time this handoff was written
- Code commit: `c0d8cacfbeb328424138b26e22cb31e82db453b6` (pushed and verified at `origin/main` before this handoff update)
- HEAD: current branch tip of `main`; verify with `git rev-parse HEAD` after the handoff update
- Remote target: `origin/main`
- Working tree: staged for the verified commit; no credentials or private logs included
- Working tree: clean after the verified code commit; this handoff metadata update is the only pending change
## Completed
@@ -41,11 +42,10 @@ updated: 2026-08-30
## Resume Procedure
1. Verify `git rev-parse HEAD` and `git ls-remote origin refs/heads/main` agree after push.
2. Update this file and the dated engineering log with the exact pushed SHA.
3. Before deployment or further SEO changes, confirm the production domain explicitly.
4. Fix server-level 404 routing and verify an unknown URL returns HTTP 404.
5. Recheck Cloudflare robots/AI crawler settings and publish claim evidence.
1. Verify the final `git rev-parse HEAD` and `git ls-remote origin refs/heads/main` after this handoff-doc commit.
2. Before deployment or further SEO changes, confirm the production domain explicitly.
3. Fix server-level 404 routing and verify an unknown URL returns HTTP 404.
4. Recheck Cloudflare robots/AI crawler settings and publish claim evidence.
## Evidence Index

View File

@@ -4,6 +4,8 @@ updated: 2026-08-30
---
# Engineering Log
Latest verified code commit: `c0d8cacfbeb328424138b26e22cb31e82db453b6` pushed to `origin/main` on 2026-08-30.
## Current Status
| Milestone | Status | Last verified | Evidence | Next action |

View File

@@ -7,7 +7,9 @@ verified: 2026-08-30
## Plan Status
**complete** — the requested local SEO trust-layer fixes, CcooL product page, and Umami event instrumentation are staged for commit. No repository master plan or roadmap was available to synchronize.
**complete** — the requested local SEO trust-layer fixes, CcooL product page, and Umami event instrumentation are committed and pushed. No repository master plan or roadmap was available to synchronize.
**Pushed code commit:** `c0d8cacfbeb328424138b26e22cb31e82db453b6`; local `main` and `origin/main` matched after push verification.
## Changed Scope
@@ -46,4 +48,4 @@ verified: 2026-08-30
## Exact Next Action
After the verified code commit is pushed, verify the remote branch tip, then update this entry and `docs/HANDOFF.md` with the exact commit SHA. Before any production deploy or domain-dependent SEO change, obtain explicit domain confirmation.
Before any production deploy or domain-dependent SEO change, obtain explicit domain confirmation. The next technical action is to fix and externally verify production 404 routing.

View File

@@ -19,6 +19,7 @@ verified: 2026-08-30
| CcooL images | **PASS** — 5 files, each 1024×768 |
| CcooL PDF | **PASS** — 5 pages, A4, readable text layer, unencrypted, no JavaScript |
| Independent reviewer | **PASS**`passed=true`, security concerns 0, logic errors 0 |
| Code commit push | **PASS**`c0d8cacfbeb328424138b26e22cb31e82db453b6`; local `main` matched `origin/main` |
## Not Covered by This Local Gate