Engineering Log

Latest verified code commit: c0d8cacfbeb328424138b26e22cb31e82db453b6 pushed to origin/main on 2026-08-30.

Current Status

Milestone Status Last verified Evidence Next action
CcooL product page and navigation complete 2026-08-30 npm run build produced 44 static pages, including /ฉนวนหุ้มท่อ-ccool/ Confirm production domain before the next deploy/SEO change
SEO trust-layer fixes complete 2026-08-30 robots/sitemap, internal links, metadata, legal-page headings, and claim wording checked in built output Fix production soft-404 routing at the server layer
Umami event convention complete 2026-08-30 Source/output scan found no malformed data-umami-event attributes Review event reports after real traffic arrives
Verification gate complete 2026-08-30 TypeScript, build, static HTML, asset probes, and independent review recorded in 2026-08-30-seo-audit-fixes Re-run after any further source change

Guardrails

  • Production domain must be explicitly confirmed before deploy or SEO work; never infer it from repository files, comments, staging URLs, or old audits.
  • Keep claims tied to accessible first-party evidence such as datasheets, certificates, and test reports.
  • Do not commit credentials, tokens, or private logs.
  • Treat production 404 behavior, Cloudflare crawler policy, image dimensions/CLS, and Product schema offers as separate follow-up work.

Entry Index

Plan Synchronization

No master plan, roadmap, or implementation-batch document was present in this repository at verification time; no plan file was invented or silently changed.