Committing the prior uncommitted working-tree state that predates this session's data-source work (was already modified/untracked at session start) so the tree is clean before push. Includes: event-study + research report integrity/forward observation work, prices tests, research hash migration script, and the 2026-08-23/24 engineering-log + test-evidence notes. Verified green as part of the full 362-test suite.
31 lines
1.9 KiB
Markdown
31 lines
1.9 KiB
Markdown
# Integrity Remediation Review — 2026-08-24
|
|
|
|
## Status
|
|
|
|
Complete for the staged integrity-remediation scope under the stated local single-user threat model. No commit or push was performed.
|
|
|
|
## Scope
|
|
|
|
The review covered canonical report-content hashing, manifest-entry identity/hash binding, replay through canonical loaders, manifest-wide validation before writes, raw/normalized snapshot binding, legacy migration boundaries, strict UTF-8/object/path/raw-hash validation, and tourism replay semantic validation.
|
|
|
|
## Independent Review Gate
|
|
|
|
- Original independent review `deleg_43348a3b` returned `passed=true` with empty `findings`, but its payload did not use the required `security_concerns` and `logic_errors` keys.
|
|
- Schema-correction review `deleg_a1c721d2` returned exactly:
|
|
`{"passed":true,"security_concerns":[],"logic_errors":[],"suggestions":[]}`
|
|
- The corrected payload was parsed and verified to contain exactly the four required keys, with `passed=true` and all arrays empty.
|
|
- Parallel review `deleg_e2d54c30` ended interrupted and contributes no evidence.
|
|
|
|
The corrected verdict closes the integrity-review gate for the stated threat model. It does not cover hostile machine owners, multi-user production deployment, live execution, or the separate point-in-time price-data readiness gate.
|
|
|
|
## Existing Verification Evidence
|
|
|
|
The parent verification already recorded 85 backend tests passing, compileall passing, Vite build passing, high-severity npm audit with zero vulnerabilities, and both working-tree and staged `git diff --check` passing. No new code was changed while processing this verdict.
|
|
|
|
## Remaining Work
|
|
|
|
- Revised vendor price history remains explicitly `point_in_time=false`.
|
|
- Independent BOT releases remain below the 12-event research threshold.
|
|
- PIT price archive design and evidence are still required before event-study/backtest readiness can be raised.
|
|
- No commit or push has been performed.
|