Engineering Log
Latest verified code commit: c0d8cacfbeb328424138b26e22cb31e82db453b6 pushed to origin/main on 2026-08-30.
Current Status
| Milestone | Status | Last verified | Evidence | Next action |
|---|---|---|---|---|
| CcooL product page and navigation | complete | 2026-08-30 | npm run build produced 44 static pages, including /ฉนวนหุ้มท่อ-ccool/ |
Confirm production domain before the next deploy/SEO change |
| SEO trust-layer fixes | complete | 2026-08-30 | robots/sitemap, internal links, metadata, legal-page headings, and claim wording checked in built output | Fix production soft-404 routing at the server layer |
| Umami event convention | complete | 2026-08-30 | Source/output scan found no malformed data-umami-event attributes |
Review event reports after real traffic arrives |
| Verification gate | complete | 2026-08-30 | TypeScript, build, static HTML, asset probes, and independent review recorded in 2026-08-30-seo-audit-fixes | Re-run after any further source change |
Guardrails
- Production domain must be explicitly confirmed before deploy or SEO work; never infer it from repository files, comments, staging URLs, or old audits.
- Keep claims tied to accessible first-party evidence such as datasheets, certificates, and test reports.
- Do not commit credentials, tokens, or private logs.
- Treat production 404 behavior, Cloudflare crawler policy, image dimensions/CLS, and Product schema offers as separate follow-up work.
Entry Index
- 2026-08-30-seo-audit-fixes — CcooL page, SEO trust layer, Umami tracking, verification, and push handoff.
Plan Synchronization
No master plan, roadmap, or implementation-batch document was present in this repository at verification time; no plan file was invented or silently changed.